Niemcy
DEUKPL



Profil firmy
Nowości
Usługi
Projekty
ENVIRAL Austria
Archiwum
Usługi
Jakość
SmartCorr
Środowisko
Serwis architektów
Referencje
Materiały do pobrania
Wyślij zapytanie
Kontakt

Nowości > ENVIRAL Austria > Przegląd wiadomości >  print current side Wyślij ten artykuł do znajomych

Wiadomości z Austrii

Long-term study of the Danube ferry Ottensheim - status after 35,000 hours

Fig. 1: Test panel not cleaned
Fig. 1: Test panel not cleaned  
Fig. 2: Test panel cleaned, right-hand edge (arrow = flow direction)
Fig. 2: Test panel cleaned, right-hand edge (arrow = flow direction)  
Fig. 3: Outer surface, facing away from the boat
Fig. 3: Outer surface, facing away from the boat  
Fig. 4: Inner surface, facing the boat
Fig. 4: Inner surface, facing the boat  

ENVIRAL® Austria

 

We have already reported several times on the long-term study of the Danube ferry of Ottensheim, which has been ongoing since 08/09/2012 (see related News below).

The test panel was subjected to a further test after 35,000 hours or 3 years and 363 days with permanent water contact. After cleaning the heavily soiled panel (Fig. 1), it could be seen that its condition is still good. It is particularly interesting to note that the edge facing away from the flow has more damage on the surface than the edge facing the flow (Fig. 2). Also, the outer surface, which experiences more flow pressure, carries significantly more damage than the surface facing the boat (Fig. 3 + 4).

Since it is currently the thawing period and the Danube has ice floes, the test was interrupted after the completion of this inspection. However, the test will be continued as soon as the snow has completely melted. We will keep you informed about the results of this inspection at this point.


Kategoria: ENVIRAL Austria
25.02.2017




More information.


ENVIRAL ® Oberflächenveredelung GmbH – D-14823 Niemegk, Altdorfer Weg 6 – Telefon +49 (0)33843 642-0 – Telefax +49 (0)33843 642-24 – 0800 368 47 25