Germany
DEUKPL



Company profile
News
Latest achievements
Projects
ENVIRAL Austria
Archive
Services
Quality
SmartCorr
Environment
Service for architects
References
Download
Request for quotation
Contact

News > ENVIRAL Austria > Article >  Print current page E-mail current page as link

Austria News

Long-term study at the Danube-ferry Ottensheim – status quo Jan 2014

  
  
Picture 1-3: Condition of the test panels after 10,200 hours of constant pressure by the water of the Danube  

ENVIRAL® Austria

As reported here previously, ENVIRAL® has conducted a long-term test at the Danube-ferry of Ottensheim since 8 September 2012. - See our reports dated 2 November 2012, 17 March 2013 and 27 May 2013.

 

The most recent examination of the test panels attached to the fer-ry's hull was carried out on 2 January 2014. At this point in time the panels had been exposed to 10,200 hours of constant pressure by the water of the Danube. The results of this test can be termed “sa-tisfactory” (see opposite picture).

 

We will keep you informed about the further progress of the study and the up-to-date results.


Category: ENVIRAL Austria
07.02.2014




More information.


ENVIRAL ® Oberflächenveredelung GmbH – D-14823 Niemegk, Altdorfer Weg 6 – Telefon +49 (0)33843 642-0 – Telefax +49 (0)33843 642-24 – 0800 368 47 25