Germany
DEUKPL



Company profile
Sponsorship projects
News
Latest achievements
Projects
ENVIRAL Austria
Archive
Services
Quality
SmartCorr
Environment
Service for architects
References
Download
Request for quotation
Contact

News > Archive >  Print current page E-mail current page as link

Visit ENVIRAL® at bautec!

bautec, the Tradefair for Building and Construction Technology, takes place for the 16th time this year and has become established as one of Germany's most popular construction trade fairs. This year...

Long-term study at the Danube-ferry Ottensheim – status quo Jan 2014

As reported here previously, ENVIRAL® has conducted a long-term test at the Danube-ferry of Ottensheim since 8 September 2012. - See our reports dated 2 November 2012, 17 March 2013 and 27 May 2013.

ENVIRAL® is expanding its production hall

Construction work commenced a few weeks ago on the expansion of the production hall for powder-coating of alrge parts and it has been making good progress since then.The hall is being expanded...

Flue gas heat recovery goes on-stream

The production process of the powder coating consumes intensive quantities of energy and heat. This is why ENVIRAL® is constantly on the lookout for potential to optimize this process. Thus, at the...

“Zum Kuckuck” (“Blimey”) …

or more precisely, “Zum Kuckuck am Pogusch”; that is the name of the construction project in the course of which ENVIRAL® was recently able to carry out the coating of very extravagant components at...

From “new” to “old”

patina effect powder coatings

Rotting wood, scuffed leather, or rusted steel are proof of a long life of the materials and conjure up memories, emotions or dreams in the observer. If you don’t want to wait decades for your...

Extended production hall in operation

A few months ago we informed you here about the beginning of the building works to the extension of the production hall for large component powder coating at the location Niemegk. We can now report...

Long-term study Danube ferry Ottensheim – status quo after 13,000 hours

ENVIRAL® has been conducting a long-term study at the Danube ferry Ottensheim since September 2012. We reported here a number of times on the respective status quo of the experiment.

ENVIRAL® renews its partnership with the Bauhaus Dessau foundation

With effect from 01.08.2014, ENVIRAL® is once again the exclusive partner of the Bauhaus Dessau foundation in the field of surface treatment / surface coating. As such, ENVIRAL® was one of the main...

Long-term study Danube ferry Ottensheim – Status after 15,000 hours

The powder-coated test sheet installed on the hull of the ferry was currently subjected to a test in January 2015. At this point in time it had been exposed to water for 15,000 hours. After cleaning,...


ENVIRAL ® Oberflächenveredelung GmbH – D-14823 Niemegk, Altdorfer Weg 6 – Telefon +49 (0)33843 642-0 – Telefax +49 (0)33843 642-24 – 0800 368 47 25